On Air Now:
Now Playing:Loading...
site loader
November 6, 2023 FG Shuts Adekunle End Of Third Mainland Bridge

The report says that the Third Mainland Bridge will be shut for five weeks for repairs as of Monday, November 6, and the Federal Controller of Works in Lagos State, Olukorede Kesha, has been discussing the closure.

READ ALSO: Federal Government To Shut Sections Of Third Mainland Bridge For 5 Weeks Starting November 6

Kesha, while addressing journalists on the bridge, notified the motoring public that the repair works were scheduled to commence with the ramps connecting Oworonshoki to Adekunle and Lagos Island (Adeniji Adele) to Adekunle simultaneously.

She stated that consequently, the two ramps will be closed to traffic and reeled out alternative routes for motorists.

Leave a Reply

Your email address will not be published. Required fields are marked *

Rating*

Watch Live

you need to specify the src of the video file

x
PHP Code Snippets Powered By : XYZScripts.com
X