The Minister of Works and Housing, BABATUNDE FASHOLA has said repair work will soon commence on the damaged Airport road link bridge.
He also disclosed that integrity test would be carried out to ascertain the level of damage on the link bridge.
The Minister was speaking during an assessment of the link bridge damaged by a fuel tanker explosion last week.
He ordered the traders under and along the Ladipo spare parts market road to vacate the area within two weeks to allow for smooth repair work.